RBMK-1000 reactors were 11.8m tall and 7m in diameter, therefore installing them inside the building required specialist equipment. There were two portal cranes capable of handling this task in the…
Tag: climbing
Pripyat dock cranes, located around Yanov backwater about 2.5km from the city centre, were used to unload supplies for the power plant and the city of Pripyat. The backwater has…